What is the consumption of Aqua Base per m²?
Updated: 15.07.2026
✓
It is usually estimated at around 1 kg/m² per layer, depending on the substrate and thickness.
Detailed answer
Aqua Base is applied in a thin layer, typically up to 1 mm, with the screed levelled 'to the grain'. As a general estimate, consumption is around 1 kg/m² per layer, but actual usage depends on substrate flatness, reinforcement mesh, and the applicator's technique. The layer thickness should not exceed 1 mm – the screed must be levelled 'to the grain'.
Common mistakes
- calculating materials without allowance
- not accounting for substrate preparation and tools
- comparing price without the same layer composition